Overview:
FieldLink is a network infrastructure staffing company helping people find rewarding careers in the Telecom and Low Voltage Industry. We specialize in customized staffing partnerships with industry leading integrators responsible for large commercial projects and government contracts nationwide.
We are hiring for Data Center Technician I's and II's (New Construction), to work in Austin, TX. This role is a contract to hire, joining a growing team offering continued industry training and a career path.
Job Responsibilities:
- Cable infrastructure and Fiber rough in.
- Cable management (dressing and labeling).
- Cable and Fiber termination.
- Rack and stack customer equipment.
- Server rack build out and rack elevation.
- Install fiber tray, ladder rack, customer equipment, and cabinets.
- Infrastructure installs (cable management, fiber tray systems, ladder racks, power trays).
- Material receiving and hardware assembly.
- Outside Plant (OSP) installation (run fiber into Data Center).
- Read and follow blueprints set for installation.
- Follow written and oral communication displaying professionalism with colleagues and management.
- Follow safety guidelines and protocols (Proper PPE, clean up jobsite, OSHA).
Job Requirements:
- High School Diploma or GED equivalency.
- 0-2 years of Data Center Technician experience.
- Active OSHA 10 – preferred.
- Physical Requirement: Must be able to work on a ladder and/or scissor lift, in confined spaces, lift to 50 pounds, and move up to 75 pounds. Ability to work on your feet for entire shift.
- Tools: Basic Hand Tools: screwdriver (multi-Bit), tape measure, snips, pliers (needle nose and channel locks), punch down tool, flashlight, work boots (steel toe or composite toe) gloves and tool pouch.
Job Type: Full-time
Pay: $20.00 - $27.00 per hour
Expected hours: 50 per week
Benefits:
- 401(k)
- Dental insurance
- Health insurance
- On-the-job training
- Paid time off
- Paid training
- Referral program
- Vision insurance
Schedule:
- 10 hour shift
- 12 hour shift
- 8 hour shift
- Overtime
- Weekends as needed
Application Question(s):
- Do you have experience installing cable trays in either data center or commercial facilities?
- Do you have experience terminating CAT6 cable?
- Are you open to working overtime, including weekends as needed?
License/Certification:
- Driver's License (Required)
Ability to Commute:
Ability to Relocate:
- Austin, TX: Relocate before starting work (Required)
Work Location: In person